Appearance
Venue
Back to the repository overview
This is the planned first venue for Traunsee Escape, the customer-facing brand of the planned Renner Interaktiv GmbH.
Selected space
Gillesberger commercial building, Hall 2, Gschwandt — 375 m². Hall 2 is the working unit identification; the signed lease plan must confirm the exact boundary and included office, wet room and parking areas.
| Item | Current position |
|---|---|
| Rent | €2,975 net/month plus VAT |
| Deposit | €8,925 (three net monthly rents) |
| Minimum term | Three years |
| Parking | Approximately 10–15 spaces discussed |
| Lease status | Agreed in principle; unsigned |
| Fit-out model | Six rent-free months; planning assumption, not agreed |
| Municipal building-law status | Oral preliminary green light, 13 August 2026: Bauamt head Martin Helmberger saw no apparent building-authority concern after hearing the concept; formal confirmation remains pending after the BH review |
| Building services | No heating, cooling or ventilation installed. After the 19 August BH meeting, an installer must prepare a room-by-room ventilation project for the full five-escape-room plus children’s-room layout; ventilation and heat-pump data sheets and exact positions must be submitted |
| Space | Nearly-new shell, about 5 m high, sectional door, LED lighting, separate room and sanitary facilities |
Before signing
- [x] Attend the BH Gmunden
Betriebsanlagensprechtag; first project meeting completed on 19 August 2026. - [x] Discuss the concept with Gschwandt Bauamt; oral preliminary building-law view is positive.
- [ ] After the BH review, return the final use/layout to Gschwandt Bauamt and obtain written confirmation whether a
Nutzungsänderung, building notice or separate building permit is required. - [ ] Written confirmation that the intended leisure use can be approved.
- [ ] Required
Betriebsanlagengenehmigungidentified and achievable. - [ ] Herr Gillesberger confirms the fire-separating construction below the hall, the currently non-fire-separating wall to the neighbouring hall and any required upgrade.
- [ ] Herr Gillesberger confirms whether the existing workshop site plan can be reused for the submission.
- [ ] Installer completes the ventilation project for the full layout and supplies ventilation/heat-pump data sheets and positions.
- [ ] Electrical contractor plans general and emergency/escape-route lighting.
- [ ] Fire, 50-person occupancy and escape-route concept accepted for the full five-room plus children’s-room layout.
- [ ] Sanitary plan provides two women’s WCs, one men’s WC plus urinal and an additional staff-only WC, subject to the final approved plan.
- [ ] Detailed plan shows all rooms, walls/ceilings, door swings, emergency openings, people per room, escape-route lengths and an at-least-1.5 m accessible corridor.
- [ ] Lease conditional on the required approvals, with clear exit and refund rights.
- [ ] Lease plan confirms Hall 2, ancillary rooms, access and parking.
Building records
- Energy certificate (PDF): planning-stage certificate issued 15 December 2023, valid through 14 December 2033. It identifies parcel 184/34 in Moosham and records class B reference heating demand of 49.7 kWh/m²a.
- Five architectural drawings and previews are linked from the full venue record.